Rejected

In this TIRME continues to manage the Santa Margarita Rejects Deposit. This dump was modified to receive rejected material from the Construction and Demolition Waste Treatment Plants until these products, assimilated to municipal waste, can be treated in the Incinerator and Energy Recovery Plant, once its capacity has been increased.


54,753 tonnes of this type of waste was deposited at this facility, which shows an decrease of 22,458 tonnes compared to the past year, that is to say a decrease of 29%. In this year a +52 level has been reached on the first deposit and the second deposit.


There is a control and modelling project of this site in progress with the University of Cantabria according to the 'MODUELO' model.