Slag Plant

Son Reus plant was constructed to treat the slag from the energy recovery plant.
The main goal of treatment is to achieve waste sufrenlos best possible uptake of metal (ferrous and non ferrous) existing in the slag.
This slag was characterized prior to configure the installation.

In Plant header space was left to store the slag from 4 to 5 days to get the
humidity of these is below 20% by weight so that no
jams or accumulation of material in plant equipment.

TIRME Environmental Technology Park Mallorca Ctra. de Sóller, km 8,2 - 07120 Palma de Mallorca
Tel. +34 971 435 050 - Fax: +34 971 435 218 info@tirme.com